For optimal viewing, select 'View on Desktop' if using a tablet.
This historic converted castellated armory now houses Portland Center Stage and its two theaters. Green materials and design mesh with original wood trusses, stone and brick. (KPFF Project)
Sustainable Features:
- First theater in the U.S. and first building on the National Register of Historic Places to achieve a LEED Platinum rating.
- 88% water savings.
- Integrated water system treats recycled runoff from the roof and from the public right-of-way. A 12,000-gallon underground cistern collects the roof water and recirculates it for landscape design features and plumbing.
- Pervious pavers and bioswales absorb rainwater for use in landscape maintenance.
Awards:
- 2007 AIA Committee on the Environment (COTE) Top Ten Green Award Honorable Mention
- 2007 AIA/IIDA Oregon Chapter Annual Design Awards, Honor Award
- 2007 Urban Land Institute Award for Excellence: The Americas
- 2007 ACEC Oregon Grand Award
- 2008 Architectural Heritage Center/Bosco-Milligan Foundation Preservation in Action Pinnacle Award
Nearby Attractions:
GERDING THEATER AT THE ARMORY
and Vera Katz Sliver Park